Municipal Fees — Praia da Vitória
The verified municipal fees for Praia da Vitória, taken from the official fee regulations. Each fee links back to the source document.
Tabela de Taxas e Outras Receitas Municipais de Urbanismo e Edificação
Verified| Fee | Amount |
|---|---|
| Planning & Construction | |
| Issuance of license or admission of prior communication for subdivision with urbanization works | 103.13 € |
| Per lot | 20.10 € |
| Per dwelling unit (per household/fireplace) | 10.03 € |
| Per other units of use | 13.82 € |
| For initial term, amendments to the initial term and extensions of term - per month or fraction | 6.27 € |
| By type of infrastructure - water supply networks, sewage networks, roadways, external arrangements, etc. - per type of work | 33.94 € |
| Addendum to the license or admission of prior communication, including registrations and, if applicable, the fees from point 2 resulting from the authorized increase will be added | 33.94 € |
| Issuance of license or acceptance of prior communication | 69.17 € |
| Per plot (lot) | 20.10 € |
| Per dwelling unit (per fire) | 10.03 € |
| Per other units of use | 13.82 € |
| Amendment to the license or acceptance of prior communication, including registrations and, where applicable, additional fees from point 2 resulting from the authorized increase | 17.58 € |
| Issuance of permit or prior communication admission | 69.17 € |
| For initial period, changes to the initial period and extensions of the period - per month or fraction | 17.58 € |
| By type of infrastructures - water supply networks, sewage networks, roadways, external arrangements, etc. - per type of work | 33.94 € |
| Amendment to the permit or prior communication, including endorsements and, where applicable, the fees of point 2 resulting from the authorized increase | 33.94 € |
| For provisional acceptance certificate of urbanization works | 103.13 € |
| Per plot in addition to the amount referred to in the previous number | 13.82 € |
| For final acceptance certificate of urbanization works | 69.17 € |
| Per plot in addition to the amount referred to in the previous number | 6.27 € |
| Housing, commerce, services and other purposes | 1.22 € |
| Industry | 1.22 € |
| Sheds, lean-tos and similar when of lightweight type, per m² of construction area | 1.22 € |
| Modification of façades of buildings adjacent to the public road, including opening, enlargement or closing of openings, doors, windows, shop windows and others, per m² of construction area | 27.66 € |
| Construction of balconies and porches — On private land (a) | 10.03 € |
| Other projecting elements (a) | 50.97 € |
| Closing of balconies, with removable or non-removable structures, per m² of construction area | 13.82 €/m² |
| Pools, per m² of construction area (a) | 3.77 €/m² |
| Construction, reconstruction or enlargement of boundary walls — Adjacent to the public road, per linear meter | 1.22 €/m |
| Construction, reconstruction or enlargement of boundary walls — Not adjacent to the public road, per linear meter | 1.22 €/m |
| Greenhouses for agricultural crops, per m² of construction area | 1.22 €/m² |
| Demolition of buildings and other constructions, when not integrated in a construction licence or prior notice procedure, per floor(original wording, Portuguese) | 17.58 €/piso |
| Land remodeling works and other urban operations not exempt or dispensed from licence or prior notice, per m² of intervened area | 0.61 €/m² |
| Execution period and extensions — Up to 15 days | 6.27 € |
| For periods longer than 15 days and for each month or fraction | 8.75 €/month |
| Telecommunications antennas and ancillary installations, per m² of occupied area | 103.23 €/m² |
| Addendum to the licence or prior notice in the situations provided in the previous numbers, including endorsements | 33.94 € |
| Issuance of license for completion of unfinished works, per month or fraction | 13.82 € |
| Extension of the deadline for the execution of urbanization works in the finishing phase, per month or fraction | 33.94 € |
| New extension of the deadline for the execution of works provided for in the permit or prior communication in the finishing phase, per month or fraction | 17.58 € |
| Request for prior information — 1.1. Land subdivision operation with urbanization works | 26.71 € |
| Request for prior information — 1.2. Land subdivision operation | 26.71 € |
| Request for prior information — 1.3. Urbanization works | 26.71 € |
| Request for prior information — 1.4. Land remodeling works | 26.71 € |
| Request for prior information — 1.5. Building works | 26.71 € |
| Request for prior information — 1.6. Impact similar to a land subdivision operation | 26.71 € |
| Request for prior information — 1.7. Others | 26.71 € |
| Request for prior information – art. 14(2) DL 555/99 — 2.1. Land subdivision operation with urbanization works | 75.45 € |
| Request for prior information – art. 14(2) DL 555/99 — 2.2. Land subdivision operation | 75.45 € |
| Request for prior information – art. 14(2) DL 555/99 — 2.3. Urbanization works | 75.45 € |
| Request for prior information – art. 14(2) DL 555/99 — 2.4. Land remodeling works | 75.45 € |
| Request for prior information – art. 14(2) DL 555/99 — 2.5. Building works | 75.45 € |
| Request for prior information – art. 14(2) DL 555/99 — 2.6. Impact similar to a land subdivision operation | 75.45 € |
| Request for prior information – art. 14(2) DL 555/99 — 2.7. Others | 75.45 € |
| Housing - per dwelling unit and its annexes | 44.03 € |
| Fixed fee | 442.76 € |
| Per each 300 m² or fraction of construction area | 138.35 € |
| Fixed fee | 276.72 € |
| Per each 300 m² or fraction of construction area | 110.65 € |
| Fixed fee | 332.07 € |
| Per each 300 m² or fraction of construction area | 82.28 € |
| Fixed fee | 322.37 € |
| Per each 300 m² or fraction of construction area | 44.03 € |
| Fixed fee | 166.02 € |
| Per each 300 m² or fraction of construction area | 55.32 € |
| Fixed fee | 110.65 € |
| Per each 300 m² or fraction of construction area | 27.66 € |
| Fixed fee | 83.01 € |
| Per each 300 m² or fraction of construction area | 44.03 € |
| Fixed fee | 166.02 € |
| Per each 300 m² or fraction of construction area | 166.02 € |
| Fixed fee | 110.65 € |
| Per each 300 m² or fraction of construction area | 110.65 € |
| Fixed fee | 110.65 € |
| Per each 300 m² or fraction of construction area | 55.32 € |
| Fixed fee | 55.32 € |
| Per each 300 m² or fraction of construction area | 55.32 € |
| Authorizations for uses not specified in previous articles – per each 300 m² or fraction of construction area | 27.66 € |
| Storage installations and refuelling installations for liquid and gaseous petroleum-derived fuels | 199.81 € |
| Authorization for installation of support infrastructures for radio communication stations | 1,136.00 € |
| Annotations in licensing, prior communication or authorization procedures not previously listed — In building works processes, respective permits or prior communications | 20.10 € |
| Annotations in licensing, prior communication or authorization procedures not previously listed — In subdivision (loteamento) processes and respective permits or prior communications | 33.94 € |
| Annotations in licensing, prior communication or authorization procedures not previously listed — In building usage procedures | 25.13 € |
| Annotations in licensing, prior communication or authorization procedures not previously listed — Any other annotations | 25.13 € |
| Annotations in permits (endorsements)(original wording, Portuguese) | 1.00 TB |
| Location opinion | 125.77 € |
| Revision of the quarry plan | 188.67 € |
| Public Space Occupation | |
| Per month and per m2 of the surface of the occupied space | 2.49 € |
| Per month and per m2 of the occupied surface if the space is not paved or treated | 1.22 € |
| Scaffolding - per month, per floor and per linear metre of occupied public domain | 1.22 € |
| Cranes, hoists or similar placed on public space - per unit and per month | 33.94 €/unit/month |
| Rammers, debris and material deposit or other occupancies - per m² and per month | 2.49 €/m²/month |
| Economic Activities | |
| Assessment of applications for installation and/or alteration licenses | 157.22 € |
| Unsealing/desselagem of machines, devices and other equipment | 125.77 € |
| Application for allocation of exploitation licence | 377.35 € |
| Application for licence due to quarry merger | 188.67 € |
| Application for licence transfer | 125.77 € |
| Traffic & Parking | |
| Temporary traffic interruption due to works - Between 07:00 and 21:00 | 12.54 € |
| Temporary traffic interruption due to works - Between 21:00 and 24:00 | 7.51 € |
| Temporary traffic interruption due to works - Between 24:00 and 07:00 | 5.01 € |
| Cemeteries | |
| Construction of graves, mausoleums and vaults — Graves | 33.94 € |
| Mausoleums and vaults | 69.17 € |
| Reconstruction of graves, mausoleums and vaults — Graves | 17.58 € |
| Reconstruction of graves, mausoleums and vaults — Mausoleums and vaults | 33.94 € |
| Camping | |
| Campsites and caravan parks | 387.38 € |
| Tourism & Lodging | |
| For tourist developments – Per each — Local accommodation (House, Apartment and Lodging establishments) | 387.78 € |
| For tourist developments – Per each — Hotel establishments (hotels, aparthotels and inns) | 552.18 € |
| For tourist developments – Per each — Tourist villages | 552.18 € |
| Tourist apartments | 552.18 € |
| Tourist complexes (resorts) | 552.18 € |
| Tourism accommodation enterprises (tourist housing) | 387.38 € |
| Rural tourism enterprises (country houses, agrotourism and rural hotels) | 387.38 € |
| Nature tourism enterprises | 387.38 € |
| Inspections | |
| Fixed fee | 20.10 € |
| Per dwelling or usage unit | 6.27 € |
| Fixed fee | 33.94 € |
| Up to 300 m2 | 81.72 € |
| Per each unit if greater than 300 m2 | 163.50 € |
| For verification of buildings' sanitary conditions, structural soundness and safety against risk of fire | 23.87 € |
| Up to two units | 33.94 € |
| Per unit | 18.86 € |
| Inspection of local accommodation establishments to verify the necessary requirements | 23.87 € |
| Periodic inspections and reinspections - per elevator | 173.57 € |
| Extraordinary inspections – per unit | 173.57 € |
| Investigations of accidents resulting from use or maintenance operations | 276.72 € |
| Sealing of elevator | 86.77 € |
| Assessment of requests for approval of construction and alteration projects(original wording, Portuguese) | 5.00 TB |
| Assessment of requests for approval of construction and alteration projects, classes A1 and A3(original wording, Portuguese) | 3.00 TB |
| Assessment of requests for approval of construction and alteration projects, class A2(original wording, Portuguese) | 4.00 TB |
| Inspections related to the licensing process(original wording, Portuguese) | 11.00 TB |
| Inspections to verify compliance with measures imposed in decisions issued on complaints(original wording, Portuguese) | 11.00 TB |
| Periodic inspections(original wording, Portuguese) | 11.00 TB |
| Repeat inspection to verify imposed conditions(original wording, Portuguese) | 11.00 TB |
| Inspections of distribution networks and branches (with tests exceeding 5 hours)(original wording, Portuguese) | 15.00 TB |
| Inspections to verify the conditions of the exercise of the activity or compliance with measures imposed in decisions on complaints and hierarchical appeals | 100.60 € |
| Inspections to verify compliance with measures imposed upon the permanent decommissioning of the industrial establishment | 100.60 € |
| Inspection requests — Triennial inspection | 188.67 € |
| Inspection requests — Inspection to verify conditions | 251.56 € |
| Documents & Certificates | |
| Issuance of a supporting/certifying certificate | 69.17 € |
| Decision of approval in prior communication procedures with deadlines provided in Regional Legislative Decree no. 38/2012/A, of 18 September — regime of free access and exercise of economic activities in the Autonomous Region of the Azores | 74.92 € |
| Issuance of certificate | 6.27 € |
| Per sheet from the second onwards | 2.49 € |
| Per sheet from the second onwards | 3.77 € |
| In electronic format, per each 100 MB or fraction | 4.50 € |
| Public notice (additional expenses applied) | 27.66 € |
| For each notice in a local or regional newspaper | 27.66 € |
| Annotation of transfer | 100.60 € |
| Other | |
| Fixed fee | 166.02 € |
| Per each 300 m² or fraction of construction area | 55.32 € |
| Fixed fee | 110.65 € |
| Per each 300 m² or fraction of construction area | 83.01 € |
| Fixed fee | 221.36 € |
| Per each 300 m² or fraction of construction area | 88.03 € |
| Fixed fee | 322.07 € |
| Per each 300 m² or fraction of construction area | 110.65 € |
| Fixed fee | 332.07 € |
| Per each 300 m² or fraction of construction area | 110.65 € |
| Fixed fee | 166.02 € |
| Per each 300 m² or fraction of construction area | 55.32 € |
| Fixed fee | 332.07 € |
| Per each 300 m² or fraction of construction area | 110.65 € |
| Fixed fee | 322.07 € |
| Per each 300 m² or fraction of construction area | 138.35 € |
| Fixed fee | 166.02 € |
| Per each 300 m² or fraction of construction area | 55.32 € |
| Fixed fee | 370.99 € |
| Per each 300 m² or fraction of construction area | 110.65 € |
| Fixed fee | 387.38 € |
| Per each 300 m² or fraction of construction area | 138.35 € |
| On plain paper – per m2 or fraction | 6.27 € |
| On reprolar or similar paper – per m2 or fraction | 33.94 € |
| In electronic format, per each 100 MB or fraction | 6.27 € |
| Authentication of documents – per sheet | 1.22 € |
| Searches, in addition to the fees and prices stated in items 2 to 5 | 2.49 € |
| In paper format – A4 | 2.52 € |
| In electronic format, per each 100 MB or fraction | 2.49 € |
| Regulation – provision of copies | 13.82 € |
| Zoning maps, by complete collection – provision of copies | 27.66 € |
| Constraint maps, by complete collection – provision of copies | 27.66 € |
| The documents mentioned above in electronic format, per each 100 MB | 13.82 € |
| In paper format – A4 | 10.03 € |
| In electronic format, per each 100 MB or fraction | 10.03 € |
| Provision of works book (b) | 8.78 € |
| Provision of public notice of permit (b) | 13.82 € |
| Assignment of police number except in cases resulting from alterations | 3.77 € |
| Annotations in sanitary permits, when valid | 20.10 € |
| Housing Technical File | 21.36 € |
| Identification plate for local accommodation establishments (b) | 29.22 € |
Frequently asked questions
Are these fees up to date?
Each fee is verified from Praia da Vitória's official fee regulation, with its source year shown. Fees can change yearly — always confirm the final amount with the Câmara Municipal.
Where do these fees come from?
From Praia da Vitória's official Regulamento de Taxas (municipal fee regulation). Each table links back to the source document.
Are these all the fees?
These are the fees we have verified from the published regulation. Some services have case-specific fees — use the assistant or confirm with the Câmara.
How do I pay a municipal fee?
Payment is made to the Câmara Municipal de Praia da Vitória, usually at the counter or on the municipal portal; the exact channel depends on the service.
Is this an official source?
No — Foral Simplifica organises public municipal information to help you prepare. The competent authority is always the Câmara Municipal; confirm the final requirements and fees with them.