LIVE

Welcome to Foral!

Beta

Foral maps and centralizes information from Portugal's 308 municipalities, bringing together data, news, public documents and alerts in one place.

Deadlines & Fees

Municipal Fees — Seixal

The verified municipal fees for Seixal, taken from the official fee regulations. Each fee links back to the source document.

Atualização da tabela de taxas para 2026

Verified

Official regulation

FeeAmount
Planning & Construction
Additional fee — For each 1,000 m² of intervention area240.35 €
Issuance of permit / prior notice for urbanization works103.82 €
Additional fee — For each month17.46 €
Additional fee — For each 1,000 m² of intervention area103.82 €
Surcharge — Per m² or linear metre of building construction area (ACE)1.18 €
Prior notification preceded by valid and favourable prior information for construction works21.92 €
Surcharge — Per m² or linear metre of building construction area (ACE)0.88 €
Preparatory works fee — fixed component increased by 20% of the variable component29.37 €
Add — per m² or linear metre of building construction area (ACE) affected1.18 €
Prior communication preceded by valid and favourable prior information for reconstruction, extension, alteration and demolition works21.92 €
Add — Per each month0.00 €
Add — Per m² or linear metre of building construction area (ACE) affected33.30 €
Add — Preparation fee: fixed component plus 20% of the variable component0.88 €
Additional — Per m² or linear metre of building construction area (ACE)(original wording, Portuguese)2.29 €/m² ou €/linear
Issuance of construction works permit21.92 €
Additional — Per m² or linear metre of building construction area (ACE)(original wording, Portuguese)0.88 €/m² ou €/linear
Additional — Preparatory fee: fixed component plus 20% of the variable component64.89 €
Additional charge — Per m² or linear metre of building construction area (ACE)(original wording, Portuguese)2.60 €/m² ou linear
Additional charge — per m² or linear metre of affected building construction area (ACE)2.29 €/m²
Issuance of building permit for reconstruction, extension, alteration and demolition works21.92 €
Minimum fee115.04 €
Buildings by use – Type: Housing (€/m2)0.02 €/m²
Buildings by use – Type: Industrial establishments, workshops and warehouses (€/m2)0.08 €/m²
Buildings by use – Type: Establishments that receive the public (€/m2)0.12 €/m²
Minimum fee230.06 €
Buildings in use – Residential type (€/m2)0.04 €/m²
Buildings in use – Industrial establishments, workshops and warehouses (€/m2)0.17 €/m²
Buildings in use – Establishments open to the public (€/m2)0.23 €/m²
Buildings by use – Residential type (€/m2)0.03 €/m²
Buildings by use – Industrial establishments, workshops and warehouses type (€/m2)0.13 €/m²
Buildings by use – Establishments open to the public type (€/m2)0.17 €/m²
Public Space Occupation
Adds 50% to the final licensing fee when not attached to any building — Kiosks, per m² and per month or fraction7.64 €/m²/month
Advertising
Electronic announcement / electronic sign / computerized advertising, per m² and per month or fraction3.41 €/m²/month
Adds 50% to the final licensing fee when not attached to any building — Illuminated or luminous sign, per m² and per month or fraction3.41 €/m²/month
Adds 50% to the final licensing fee when not attached to any building — Flag, flagpole, pennant, per m² and per month or fraction2.21 €/m²/month
Adds 50% to the final licensing fee when not attached to any building — Blimp, balloon, zeppelin, inflatable, light aircraft, helicopter, paraglider, parachute, per m² and per month or fraction6.92 €/m²/month
Adds 50% to the final licensing fee when not attached to any building — A-frame/stand, per m² and per month or fraction3.10 €/m²/month
Adds 50% to the final licensing fee when not attached to any building — Column, per m² and per month or fraction3.25 €/m²/month
Adds 50% to the final licensing fee when not attached to any building — Frame, per m² and per month or fraction3.10 €/m²/month
Adds 50% to the final licensing fee when not attached to any building — Canvas / tarpaulin, per m² and per month or fraction3.25 €/m²/month
Adds 50% to the final licensing fee when not attached to any building — Vinyl, per m² and per month or fraction3.25 €/m²/month
Adds 50% to the final licensing fee when not attached to any building — Shop window display, per m² and per month or fraction3.25 €/m²/month
Adds 50% to the final licensing fee when not attached to any building — Poster or plate, per m² and per month or fraction2.21 €/m²/month
Adds 50% to the final licensing fee when not attached to any building — Handrail or advertising balustrade, per m² and per month or fraction3.04 €/m²/month
Adds 50% to the final licensing fee when not attached to any building — Banner, advertising tape and gantry, per m² and per month or fraction2.45 €/m²/month
Adds 50% to the final licensing fee when not attached to any building — Individual letters or symbols, per m² and per month or fraction2.46 €/m²/month
Adds 50% to the final licensing fee when not attached to any building — Mast, per m² and per month or fraction3.67 €/m²/month
Adds 50% to the final licensing fee when not attached to any building — Monopole, per m² and per month or fraction6.61 €/m²/month
Adds 50% to the final licensing fee when not attached to any building — Adds to the final licensing fee, from 2.50 m height, per metre(original wording, Portuguese)152.52 €/metro
Adds 50% to the final licensing fee when not attached to any building — Mupi (street furniture ad panel), per m² and per month or fraction7.64 €/m²/month
Adds 50% to the final licensing fee when not attached to any building — Panel / outdoor billboard, per m² and per month or fraction6.04 €/m²/month
Adds 50% to the final licensing fee when not attached to any building — Adds to the final licensing fee, from 2.50 m height, per metre(original wording, Portuguese)152.52 €/metro
Adds 50% to the final licensing fee when not attached to any building — Pennant - each ten units, per m² and per month or fraction2.45 €/m²/month
Adds 50% to the final licensing fee when not attached to any building — Signboard, per m² and per month or fraction2.49 €/m²/month
Adds 50% to the final licensing fee when not attached to any building — Small sign, per m² and per month or fraction2.21 €/m²/month
Adds 50% to the final licensing fee when not attached to any building — Awning or valance, per m² and per month or fraction2.21 €/m²/month
Adds 50% to the final licensing fee when not attached to any building — Advertising on sidewalks, per m² and per year or fraction15.09 €/m²/year
Adds 50% to the final licensing fee when not attached to any building — Mobile advertising unit, per unit and per month or fraction31.83 €/unit/month
Adds 50% to the final licensing fee when not attached to any building — Advertising campaign on vehicle, per m² and per month or fraction4.66 €/m²/month
Adds 50% to the final licensing fee when not attached to any building — Advertising campaign on taxis, per m² and per month or fraction3.55 €/m²/month
Adds 50% to the final licensing fee when not attached to any building — a) Advertising campaign on public transport, per m² and per month or fraction3.55 €/m²/month
Adds 50% to the final licensing fee when not attached to any building — b) Advertising on road viaducts, railway viaducts and pedestrian overpasses, per m² and per month or fraction3.55 €/m²/month
Adds 50% to the final licensing fee when not attached to any building — Sound advertising, per hour and per emission source4.30 €/hour
Adds 50% to the final licensing fee when not attached to any building — Street advertising campaign, per day15.25 €/day
Adds 50% to the final licensing fee when not attached to any building — e) Advertising installed on gable end or blind side façade, per m² and per month or fraction12.44 €/m²/month
Adds 50% to the final licensing fee when not attached to any building — f) Waste container, per m² and per month or fraction3.25 €/m²/month
Adds 50% to the final licensing fee when not attached to any building — g) Other containers, per m² and per month or fraction3.25 €/m²/month
Adds 50% to the final licensing fee when not attached to any building — h) Directional advertising signage per panel and per month(original wording, Portuguese)6.02 €/painel/mês
Adds 50% to the final licensing fee when not attached to any building — Shelters, per m² and per month or fraction7.64 €/m²/month
Adds 50% to the final licensing fee when not attached to any building — j) Advertising installed on scaffolding or hoarding, per m² and per month or fraction3.25 €/m²/month
Adds 50% to the final licensing fee when not attached to any building — k) Parasols or windshields, per unit and per month or fraction3.25 €/unit/month
Adds 50% to the final licensing fee when not attached to any building — Roofs, coverings or terraces, per m² and per month or fraction6.04 €/m²/month
Adds 50% to the final licensing fee when not attached to any building — oo) Other unspecified advertising, per m² or m³ or linear metre, and per month or fraction3.41 €
Markets & Fairs
Adds 50% to the final licensing fee when not attached to any building — Caravans / Sales stands, per unit and per month or fraction31.83 €/unit/month
Other
Surcharge — Per month33.30 €
Additional — Per each month33.30 €/month
Minimum fee172.56 €

Atualização das taxas de licenciamento e de vistorias

Verified

Official regulation

FeeAmount
Planning & Construction
As part of the process for granting a certificate of occupancy and constitution of horizontal property — General fee21.73 €
Article 1, no. 4 — Notations/endorsements for which no special fee is provided9.35 €
Acts — Evaluation of requests for approval of construction and alteration projects260.33 €
Acts — Annotations/endorsements (averbamentos)104.13 €
Economic Activities
Licences for other establishments subject to licensing145.43 €
Inspections
Article 35-A — Per expert15.57 €
Acts — Inspections related to the licensing process312.39 €
Acts — Inspections to verify compliance with measures imposed in decisions issued on complaints312.39 €
Acts — Repeat inspection to verify imposed measures312.39 €
Documents & Certificates
Article 2 — Supply, at the request of interested parties, of documents necessary to replace those lost or in poor condition — per document1.93 €
Other
Article 3 — Other claims of private interests, or provision of public services, when no specific fee is provided2.48 €

Atualização do tarifário para 2026 – Edital n.º 19/2026

Verified

Official regulation

FeeAmount
Water, Sanitation & Waste
Water supply tariff0.36 €/m³
Wastewater sanitation tariff2.38 €
Commercial, Industrial, Agricultural and For-profit Entities - Water supply tariff1.17 €/m³
Fixed component3.13 €
Meter replacement due to damage or theft: a) Equal to or less than 20mm38.98 €
Reconnection of the water supply for reasons attributable to the user25.13 €
Simple registration of Disconnection Notices1.31 €
Extraordinary verification of the water meter (in accordance with the IPQ fees in force)15.51 €
Nominal flow ≤ 3.5 m3/h90.80 €
3.5 m3/h < Nominal flow ≤ 10 m3/h105.76 €
10 m3/h < Nominal flow ≤ 50 m3/h120.72 €
I. 1"-32mm308.38 €
II. 1"1/2-50mm431.70 €
III. 2"-63mm616.75 €
110 mm154.37 €
125 mm181.65 €
140 mm185.24 €
160 mm208.58 €
180 mm245.49 €
200 mm262.32 €
225 mm295.79 €
250 mm390.57 €
280 mm409.37 €
315 mm490.83 €
355 mm645.64 €
400 mm735.56 €
450 mm919.56 €
500 mm1,035.13 €
560 mm1,172.67 €
630 mm1,550.87 €
63 mm641.66 €
75 mm769.99 €
90 mm898.32 €
110 mm1,026.65 €
125 mm1,604.15 €
140 mm1,604.15 €
160 mm1,796.64 €
180 mm1,796.64 €
200 mm2,566.64 €
225 mm2,566.64 €
250 mm3,849.94 €
280 mm3,849.94 €
315 mm5,133.26 €
355 mm5,774.90 €
400 mm6,416.56 €
450 mm7,058.24 €
500 mm7,699.87 €
560 mm8,983.20 €
Developments up to 50 consumers341.80 €
Developments up to 250 consumers683.59 €
Developments up to 500 consumers1,025.39 €
Developments up to 1,000 consumers1,367.20 €
Developments of 1,000 or more consumers2,050.79 €
Mandatory inspection of the domestic wastewater connection33.57 €
Certificate of authorization for wastewater discharge37.24 €
Extraordinary reading of rejected flow rates at user's request12.71 €
Urban solid waste fee0.68 €
Urban solid waste fee5.20 €
Soils3.57 €
Bulky waste (monos)109.29 €
MSW (RSU - Municipal Solid Waste)109.29 €
Green waste0.00 €
Construction and demolition waste (C&DW)3.57 €
Other waste109.29 €
Rubble removal - bag rental (Big-Bag type)31.76 €
Removal of bulky waste and green waste - 15 m³ container rental163.87 €
Collection of MSW from large producers - 800 litre container18.78 €
120 litre container23.99 €
240 litre container37.27 €
Documents & Certificates
Changes to the initial contract (notably, mailing address change, cancellation of bank direct debit, whether initiated by the customer or the banking institution, among others)2.51 €
Charges for domiciled contracts, for each bank return due to insufficient funds or other reasons0.92 €
Duplicate copies of documents0.92 €
Other
Up to 6 units, per unit53.60 €
More than 6 units, per unit40.19 €
Variable component - amount per hour or fraction52.03 €
With cash enforcement697.01 €

Regulamento de Procedimentos de Licenciamento de Instalações de Armazenamento de Produtos Derivados do Petróleo, Instalações de Abastecimento de Combustíveis Líquidos e Gasosos Derivados do Petróleo e Áreas de Serviço

Verified

Official regulation

FeeAmount
Inspections
Assessment of applications for approval of construction and alteration projects800.00 €
Inspections related to the licensing process550.00 €
Inspections to verify compliance with measures imposed in decisions on appeals550.00 €
Repeat inspection to verify the imposed measures500.00 €
Documents & Certificates
Endorsements/annotations100.00 €

Regulamento de Taxas do Município do Seixal

Verified

Official regulation

FeeAmount
Planning & Construction
Urbanism — No. 1 — Construction and reinforcement of general urban infrastructures36.25 €
Prior information or revalidation of prior information for land remodeling works375.19 €
Urban operations — Housing — Prior communication of land remodeling works preceded by favorable and valid prior information185.17 €
Application for licensing of land remodeling works375.19 €
Urban operations — Commerce and Services — Issuance of permit for land remodeling works185.17 €
Prior communication of land remodeling works474.25 €
Request to amend the licensing/prior communication of land remodeling works375.19 €
Addendum to permit/prior communication for subdivision operation without urbanization works185.17 €
Prior information or revalidation of prior information for subdivision operation without urbanization works2,194.65 €
Urban operations — Housing — Prior communication of subdivision operation without urbanization works839.76 €
Request for renewal of expired permit or new prior notice of urbanization works, under article 72 of the Legal Regime for Urbanization and Building. Additional: a) Per each 1,000 m2 of intervention area2,030.54 €
Issuance of permit/prior notice for urbanization works. Additional: a) Per each month b) Per each 1,000 m2 of intervention area877.16 €
Prior information and revalidation of prior information for construction works. Additional: a) Per m2 or linear metre of building construction area (ACE)248.25 €
Prior notice preceded by valid and favourable prior information for construction works. Additional: a) Per each month b) Per m2 or linear metre of building construction area (ACE)185.17 €
Prior information and revalidation of prior information for reconstruction, extension, alteration and demolition works. Additional: a) Per m2 or linear metre of affected building construction area (ACE)248.25 €
Prior notice preceded by valid and favourable prior information for reconstruction, extension, alteration and demolition works. Additional: a) Per each month b) Per m2 or linear metre of affected building construction area (ACE)185.17 €
Request for licensing of construction works. Additional: a) Per m2 or linear metre of building construction area (ACE)483.93 €
Issuance of construction works permit. Additional: a) Per each month b) Per m2 or linear metre of building construction area (ACE)185.17 €
Prior notice of construction works. Additional: a) Per each month b) Per m2 or linear metre of building construction area (ACE)548.27 €
Request for licensing of reconstruction, extension, alteration and demolition works. Additional: a) Per m2 or linear metre of affected building construction area (ACE)483.93 €
Issuance of permit for reconstruction, extension, alteration and demolition works. Additional: a) Per each month b) Per m2 or linear metre of affected building construction area (ACE)185.17 €
Prior notice of reconstruction, extension, alteration and demolition works. Additional: a) Per each month b) Per m2 or linear metre of affected building construction area (ACE)126.74 €
Request to alter the permit/prior notice for reconstruction, extension, alteration and demolition works. Additional: a) Per m2 or linear metre of affected building construction area (ACE)483.93 €
Addition to the permit/prior notice for reconstruction, extension, alteration and demolition works. Additional: a) Per each month b) Per m2 or linear metre of affected building construction area (ACE)185.17 €
Authentication of the building works book24.02 €
Second copy of building works book24.02 €
Request for annotation/endorsement, per each44.53 €
Civil construction works, Monday to Friday, between 18:00 and 22:0033.08 €
Civil construction works, Monday to Friday, between 22:00 and 07:0044.10 €
Civil construction works, Saturdays and Sundays44.10 €
No. 1 — Construction and reinforcement of general urban infrastructures — by building construction area31.81 €
No. 1 — Construction and reinforcement of general urban infrastructures — by building construction area25.45 €
No. 1 — Construction and reinforcement of general urban infrastructures — by building construction area25.45 €
Prior information or revalidation of prior information for land remodeling works37.52 €
Surcharge — For each 1,000 m² of intervention area37.52 €
Urban operations — Housing — Prior notification of land remodeling works preceded by favorable and valid prior information18.52 €
Surcharge — Per month10.72 €
Surcharge — For each 1,000 m² of intervention area18.52 €
Request for licensing of land remodeling works37.52 €
Surcharge — For each 1,000 m² of intervention area37.52 €
Urban operations — Commerce and Services — Issuance of permit for land remodeling works18.52 €
Surcharge — Per month10.72 €
Surcharge — For each 1,000 m² of intervention area18.52 €
Prior notification of land remodeling works47.43 €
Surcharge — Per month10.72 €
Surcharge — For each 1,000 m² of intervention area47.43 €
Request for amendment to licensing/prior notification of land remodeling works37.52 €
Surcharge — For each 1,000 m² of intervention area37.52 €
Addition to the permit/prior notification of subdivision without urbanization works18.52 €
Surcharge — Per month10.72 €
Surcharge — For each 1,000 m² of intervention area18.52 €
Prior information or revalidation of prior information for subdivision operation without urbanization works219.47 €
Surcharge — Per m² of building area0.88 €
Urban operations — Housing — Prior notification of subdivision operation without urbanization works83.98 €
Surcharge — Per m² of building area0.34 €
Prior information or revalidation of prior information for subdivision operation with urbanization works366.93 €
Additional — Per m2 of building area1.47 €/m²
Prior notification of subdivision operation with urbanization works132.03 €
Additional — Per month10.72 €/month
Additional — Per m2 of building area0.53 €/m²
Application for licensing of subdivision operation without urbanization works219.47 €
Additional — Per m2 of building area0.88 €/m²
Issuance of subdivision permit without urbanization works87.72 €
Additional — Per m2 of building area0.35 €/m²
Application for amendment to licensing/prior notification of subdivision without urbanization works219.47 €
Additional — Per m2 of affected building area0.88 €/m²
Addendum to subdivision permit/prior notification without urbanization works87.72 €
Additional — Per m2 of affected building area0.35 €/m²
Application for licensing of subdivision operation with urbanization works378.05 €
Additional — Per m2 of building area1.51 €/m²
Issuance of subdivision permit with urbanization works135.77 €
Additional — Per month14.75 €/month
Additional — Per m2 of building area0.54 €/m²
Application for amendment to licensing/prior notification of subdivision with urbanization works366.93 €
Additional — Per m2 of affected building area1.47 €/m²
Addendum to subdivision permit/prior notification with urbanization works135.77 €
Additional — Per month14.75 €/month
Additional — Per m2 of affected building area0.54 €/m²
Provisional acceptance, per each 1,000 m2 of intervention area(original wording, Portuguese)74.69 €/1.000m2
Definitive acceptance, per each 1,000 m2 of intervention area(original wording, Portuguese)77.22 €/1.000m2
Repeat inspection, per each 1,000 m2 of intervention area(original wording, Portuguese)78.19 €/1.000m2
Request for reduction of guarantee/deposit239.16 €
Preparatory fee — fixed component plus 20% of the variable component — Preparatory fee — 80% of the applicable fee value191.33 €
Request for renewal of lapsed permit or new prior notification of subdivision operation without urbanization works, under article 72 of the Legal Regime of Urbanization and Building136.33 €
Additional — Per m2 of building area0.55 €/m²
Issuance of subdivision permit without urbanization works63.69 €
Additional — Per month10.72 €/month
Additional — Per m2 of building area0.25 €/m²
Preparation fee — fixed component increased by 20% of the variable component 13 — Request for renewal of expired permit or new prior communication of sub-division operation with urbanization works, under article 72 of the Legal Regime for Urbanization and Building203.05 €
Adds — Per m² of construction area0.81 €
Adds — Preparation fee — fixed component increased by 20% of the variable component 13.1 — Issuance of permit/prior communication for subdivision with urbanization works87.72 €
Adds — Per each month14.75 €
Adds — Per m² of construction area0.35 €
Adds — Preparation fee — fixed component increased by 20% of the variable component 14 — Amendment to the subdivision permit under article 27(8) of the Legal Regime for Urbanization and Building115.13 €
Adds — Per m² of affected construction area0.46 €
Adds — Preparation fee — fixed component increased by 20% of the variable component 14.1 — Addendum to the subdivision permit under article 27(8) of the Legal Regime for Urbanization and Building112.33 €
Adds — Per each month14.75 €
Adds — Per m² of affected construction area0.45 €
Adds — Preparation fee — fixed component increased by 20% of the variable component 15 — Issuance of detailed plan certificate under article 92-A of Decree-Law no. 380/99 of 22 September (RJIGT), and subsequent amendments87.72 €
Adds — Per each month14.75 €
Adds — Per m² of construction area0.35 €
Adds — Preparation fee — fixed component increased by 20% of the variable component 15.1 — Addendum to the detailed plan certificate87.72 €
Adds — Per each month14.75 €
Adds — Per m² of affected construction area0.35 €
Preliminary information or revalidation of preliminary information for urbanization works234.39 €
Adds — Per each 1,000 m² of intervention area234.39 €
Adds — Preparation fee — fixed component increased by 20% of the variable component 1.1 — Prior communication of urbanization works preceded by favourable and valid preliminary information53.91 €
Adds — Per each month10.72 €
Adds — Per each 1,000 m² of intervention area53.91 €
Adds — Preparation fee — fixed component increased by 20% of the variable component 2 — Request for licensing of urbanization works228.27 €
Adds — Per each 1,000 m² of intervention area228.27 €
Adds — Preparation fee — fixed component increased by 20% of the variable component 2.1 — Issuance of urbanization works permit53.91 €
Adds — Per each month10.72 €
Adds — Per each 1,000 m² of intervention area53.91 €
Adds — Preparation fee — fixed component increased by 20% of the variable component 3 — Prior communication of urbanization works236.87 €
Adds — Per each month10.72 €
Adds — Per each 1,000 m² of intervention area236.87 €
Adds — Preparation fee — fixed component increased by 20% of the variable component 4 — Request for amendment to the licensing/prior communication of urbanization works115.13 €
Adds — Per each 1,000 m² of intervention area115.13 €
Adds — Preparation fee — fixed component increased by 20% of the variable component43.13 €
Preparation fee — fixed component increased by 20% of the variable component; 5.1 — Issuance of permit for reconstruction, enlargement, alteration and demolition works18.52 €
Additional: Per month28.14 €
Additional: Per m² or linear of building construction area (ACE) affected0.74 €/m²
Additional: Preparation fee — fixed component increased by 20% of the variable component; 6 — Prior notification of reconstruction, enlargement, alteration and demolition works12.67 €
Additional: Per month28.14 €
Additional: Per m² or linear of building construction area (ACE) affected0.51 €/m²
Additional: Preparation fee — fixed component increased by 20% of the variable component; 7 — Request for amendment to permit/prior notice for reconstruction, enlargement, alteration and demolition works48.39 €
Additional: Per m² or linear of building construction area (ACE) affected1.94 €/m²
Additional: Preparation fee — fixed component increased by 20% of the variable component; 7.1 — Addendum to permit/prior notice for reconstruction, enlargement, alteration and demolition works11.57 €
Additional: Per month28.14 €
Additional: Per m² or linear of building construction area (ACE) affected0.74 €/m²
On issuance of permit/prior notice for reconstruction, enlargement and alteration works, the provisions of points 4.1 and 5 of this number apply respectively — No. 6 — Works in municipal domain with pipes, conduits, cables and similar and constructed structures221.25 €
Additional: Per m² of area affected by the intervention47.53 €/m²
Prior information and revalidation of prior information for works in municipal domain with pipes, conduits, cables and similar and constructed structures — Prior notice preceded by valid and favorable prior information for works in municipal domain with pipes, conduits, cables and similar22.30 €
Additional: Per day1.22 €/day
Additional: Per m² of area affected by the intervention47.53 €/m²
Issuance of permit/prior notice for works in municipal domain with pipes, conduits, cables and similar and constructed structures237.67 €
Additional: Per day1.22 €/day
Additional: Per m² of area affected by the intervention47.53 €/m²
Request for licensing of trench excavation works30.27 €
Additional: Per each m² of intervention area1.21 €/m²
Additional: Preparation fee — fixed component increased by 20% of the variable component; 3.1 — Issuance of permit for trench excavation works18.52 €
Additional — Per each month28.14 €/month
Additional — Per each m² of intervention area0.74 €/m²
No. 7 — Extension of the permit term — under articles 53(3) and 58(5) of the Urbanization and Building Legal Regime21.45 €
No. 7 — Extension of the permit term — under articles 53(4) and 58(6) of the Urbanization and Building Legal Regime21.45 €
Special licence for completion of unfinished works, under article 88 of the Urbanization and Building Legal Regime, per each month124.85 €/month
Granting of the occupancy permit or change of occupancy17.77 €
Additional — Per each m² of building construction area, for housing1.07 €/m²
Additional — Per each m² of building construction area, for other uses0.71 €/m²
Prior information for change of occupancy authorization119.27 €
Granting of change to the occupancy authorization6.21 €
Additional — Per each m² of building construction area, for housing1.07 €/m²
Additional — Per each m² of building construction area, for other uses0.71 €/m²
Constitution of a building under horizontal property regime140.76 €
No. 9 — Constitution of a building under horizontal property regime — Additional per unit starting from the third unit44.78 €
Extension of licence term, per each month — Certificate of approval of building under horizontal property regime14.75 €
Preparation fee — 80% of the applicable tax value — Additional per unit starting from the third unit7.50 €
No. 10 — Temporary Maintenance of Construction and Use of Infrastructure — No. 11 — Inspections to be carried out under this chapter32.20 €
No. 10 — Temporary Maintenance of Construction and Use of Infrastructure — Additional per m² of building construction area1.29 €/m²
Application for subdivision/delimitation (pedido de destaque)140.76 €
Extension of licence term, per each month — Reconsideration of the subdivision/delimitation application140.76 €
Under Decree-Law no. 267/2002 of 26 November, as amended and republished by Decree-Law no. 217/2012 of 9 October, and the Regulation of Licensing Procedures for Petroleum Product Storage Installations, Liquid Fuel Supply Installations120.95 €
To the value of these fees will be added the amounts of municipal services' expenses that constitute charges of the license holder — ≥ 100m³ — 8×TB, plus 0.1 TB for each 10 (or fraction) above 100m³967.56 €
To the value of these fees will be added the amounts of municipal services' expenses that constitute charges of the license holder — ≥ 50m³ < 100m³ — 4×TB483.78 €
To the value of these fees will be added the amounts of municipal services' expenses that constitute charges of the license holder — ≥ 10m³ < 50m³ — 2.50×TB302.36 €
To the value of these fees will be added the amounts of municipal services' expenses that constitute charges of the license holder — ≥ 100m³ — 5.5×TB665.20 €
To the value of these fees will be added the amounts of municipal services' expenses that constitute charges of the license holder — ≥ 50m³ < 100m³ — 4.5×TB544.25 €
To the value of these fees will be added the amounts of municipal services' expenses that constitute charges of the license holder — ≥ 10m³ < 50m³ — 3×TB362.84 €
To the value of these fees will be added the amounts of municipal services' expenses that constitute charges of the license holder — < 10m³ — 3×TB362.84 €
To the value of these fees will be added the amounts of municipal services' expenses that constitute charges of the license holder — ≥ 100m³ — 5.5×TB665.20 €
To the value of these fees will be added the amounts of municipal services' expenses that constitute charges of the license holder — ≥ 50m³ < 100m³ — 4.5×TB544.25 €
Public Space Occupation
Licence/Renewal for occupation and use of municipal domain80.01 €
Prior communication with deadline/Renewal for occupation and use of municipal domain62.08 €
Simple prior communication/Renewal for occupation and use of municipal domain5.55 €
Licence/Renewal for occupation and use of municipal domain108.08 €
Prior communication with deadline/Renewal for occupation and use of municipal domain90.16 €
Simple prior communication/Renewal for occupation and use of municipal domain5.55 €
License/Renewal for occupation and use of municipal domain183.81 €
Prior notice with deadline/Renewal for occupation and use of municipal domain165.89 €
Simple prior notice/Renewal for occupation and use of municipal domain5.55 €
License/Renewal for occupation and use of municipal domain249.51 €
License/Renewal for occupation and use of municipal domain127.99 €
Prior notice with deadline/Renewal for occupation and use of municipal domain110.07 €
Simple prior notice/Renewal for occupation and use of municipal domain5.55 €
Endorsement on the license/prior notice with deadline/simple prior notice for occupation and use of municipal domain40.32 €
License for occupation or use of municipal domain with pipes, ducts, conductive cables and similar and built structures315.49 €
License for occupation and use of municipal domain due to works, including works not subject to or exempt from prior urban planning control57.19 €
License for occupation and use of municipal domain for film shootings241.52 €
Prohibition of passage for public safety reasons, per m2 of prohibited area and per day41.57 €
License for other occupations and uses of the municipal domain not specifically foreseen, per linear meter or m2 or m3 or fraction, according to the nature of the occupation, and per month or fraction80.01 €
Itinerant or improvised venues11.03 €
-2.06 €/m²/month
-2.06 €/m²/month
-3.10 €/m²/month
-5.58 €/m²/month
-(original wording, Portuguese)128.86 €/metro
-6.46 €/m²/month
-5.11 €/m²/month
-(original wording, Portuguese)128.86 €/metro
-2.06 €/m²/month
-2.10 €/m²/month
-1.86 €/m²/month
-1.86 €/m²/month
-12.75 €/m²/year
-26.89 €/unit/month
-3.93 €/m²/month
-3.00 €/m²/month
-3.00 €/m²/month
-3.00 €/m²/month
-3.64 €/hour
-12.88 €/day
-10.50 €/m²/month
-2.75 €/m²/month
-2.75 €/m²/month
-(original wording, Portuguese)4.25 €/painel/mês
-6.46 €/m²/month
-2.75 €/m²/month
-2.75 €/unit/month
-6.46 €/m²/month
-5.11 €/m²/month
-26.89 €/unit/month
-2.88 €
-40.32 €
-80.01 €
Advertising
License/renewal of advertising80.01 €
Change of medium or support of the advertising message80.01 €
Markets & Fairs
Authorization for holding a wholesale market on public or private domain43.65 €
Notification of specific regulation for wholesale market7.40 €
Consultation of specific regulation for wholesale market7.36 €
Consultation of procedure for allocation of a sales place in a wholesale market7.36 €
Consultation of registers of wholesale traders7.36 €
Sales place in wholesale market16.46 €
Authorization for holding a market on private premises or public domain43.65 €
Sales space in markets held in public venues, per m² per month16.46 €/m²/month
Simple prior notification for sale of companion animals in a market or fair23.12 €
Economic Activities
License for night watch activity39.19 €
Renewal of the license for night watch activity41.04 €
Issuance of the night watch card33.26 €
Replacement copy of the night watch card33.26 €
Application for registration of automatic, mechanical, electrical and electronic amusement machines, per machine40.76 €
Request for annotation due to transfer of ownership, per machine40.76 €
License to access the taxi transport activity, per vehicle262.93 €
Duplicate of the license to access the taxi transport activity, per vehicle157.76 €
Request for substitution of licensed vehicle, including inspection for conformity verification262.93 €
Request for substitution of the license in case of transfer110.80 €
Simple prior notification of establishment installation for trade and storage of food products37.68 €
Prior notification with deadline for exemption from installation/operation requirements of trade and storage of food products43.26 €
Notification of change of name/signage of trade and storage of food products37.68 €
Notification of change of holder of the operation of the trade and storage of food products37.68 €
Notification of expansion/reduction of sales area of the trade and storage of food products37.68 €
Simple prior notification of change of business activity of the trade and storage of food products37.68 €
Simple prior notification of installation of trade and services establishment with health and safety risks41.45 €
Prior notification with deadline for exemption from installation/operation requirements of trade and services establishments with health and safety risks47.59 €
Notification of change of name/signage of trade and services establishments with health and safety risks41.45 €
Notification of change of holder of the operation of trade and services establishments with health and safety risks41.45 €
Notification of expansion/reduction of sales area of trade and services establishments with health and safety risks41.45 €
Simple prior notification of change of business activity of trade and services establishments with health and safety risks41.45 €
Simple prior notification of installation of catering and beverage establishment37.68 €
Prior notification with deadline for exemption from installation/operation requirements of catering and beverage establishments43.26 €
Notification of change of name/signage of catering and beverage establishment37.68 €
Notification of change of holder of the operation of catering and beverage establishment37.68 €
Notification of expansion/reduction of sales area of catering and beverage establishment37.68 €
Simple prior notification of change of business activity of catering and beverage establishment37.68 €
Prior notification with deadline for provision of non-sedentary catering or beverage services69.18 €
Events in catering and beverage establishments11.03 €
≥ 10m³ < 50m³ – 3×TB362.84 €
< 10m³ – 3×TB362.84 €
≥ 100m³ – 5.5×TB665.20 €
≥ 50m³ < 100m³ – 4.5×TB665.20 €
≥ 10m³ < 50m³ – 3×TB665.20 €
< 10m³ – 3×TB665.20 €
≥ 100m³ – 1×TB120.95 €
≥ 50m³ < 100m³ – 1×TB120.95 €
≥ 10m³ < 50m³ – 1×TB120.95 €
< 10m³ – 1×TB120.95 €
No. 17 — Special Fees for Type 3 Industrial Establishments (TB — €94.92 (2012))97.84 €
Opening Hours
Simple prior notification of establishment opening hours15.18 €
Extension/reduction of establishment opening hours outside regulated limits124.01 €
Noise
Special noise permit55.13 €
Special noise license55.13 €
Pets & Animals
On-site inspection by the municipal veterinary doctor110.17 €
Sports & Pools
Sporting races or similar on public roads5.51 €
Camping
License for the holding of occasional camps41.80 €
Culture & Museums
Concerts11.03 €
Tourism & Lodging
Classification of tourist enterprise186.96 €
Revision of classification of tourist enterprise183.26 €
Change of the operating entity of the tourist enterprise110.80 €
Classification of tourist enterprise186.96 €
Review of classification of tourist enterprise183.26 €
Change of operating entity of the tourist enterprise110.80 €
Inspections
Health inspection192.85 €
Safety inspection192.85 €
Other hygienic-sanitary inspection services90.02 €
Other inspections to be carried out within this chapter122.92 €
Inspection, per expert18.09 €
Other inspections to be carried out under this chapter122.92 €
Inspections for LPG bottle storage parks, with capacity ≥ 0.520m³389.11 €
Periodic inspections133.26 €
Periodic re-inspections133.26 €
Extraordinary inspections191.56 €
Sealing and unsealing of lifts131.46 €
No. 16 — Technical assessment 1 — Issuance221.25 €
Additional per m² of assessed area47.53 €/m²
Documents & Certificates
Annotations of any kind, not specially provided for, per each15.57 €
Terms of return of documents attached to files whose restitution has been authorized15.57 €
Records, administrative inquiries and terms of any kind, not specially provided for, per each6.79 €
Supply, at the request of interested parties, of documents necessary for the replacement of those that have been lost or are in poor condition15.57 €
Checking and authentication of documents submitted by private individuals, per page15.57 €
Authenticated photocopies38.71 €
Document searches, per volume18.19 €
Certificate of content of deliberations, of orders or of extracts of minutes22.65 €
Narrative certificate of deliberations, of orders or of extracts of minutes28.82 €
Posting and certification of Notices and Edicts, per each21.00 €
Endorsement statement on the manner of execution of contracts and supplies, per each37.55 €
Various declarations, per each37.55 €
II. From the 6th page onwards, per page — In municipal premises23.72 €
II. From the 6th page onwards, per page — Outside premises90.02 €
Request for annotation, per each33.26 €
Endorsement/annotation on the license40.32 €
Authentication of a written or drawn document44.92 €
Right to information under Article 110 of the Legal Regime of Urbanization and Building48.63 €
Issuance221.25 €
Request for endorsement, per item110.80 €
Joining of elements to existing procedures, up to three58.26 €
No. 15 — Administrative Matters — Added, for each document from the third5.83 €
Deposit of housing technical sheet25.84 €
No. 15 — Administrative Matters — Preparation fee — 80% of the applicable fee value20.67 €
Issuance of duplicate housing technical sheet51.68 €
No. 15 — Administrative Matters — Preparation fee — 80% of the applicable fee value41.34 €
No. 15 — Administrative Matters — of location21.45 €
No. 15 — Administrative Matters — of police number allocation21.45 €
No. 15 — Administrative Matters — of police number change21.45 €
No. 15 — Administrative Matters — of parish change21.45 €
No. 15 — Administrative Matters — of authorization of use21.45 €
No. 15 — Administrative Matters — proof of payment of lotting licence fees21.45 €
No. 15 — Administrative Matters — of guaranteed infrastructures21.45 €
No. 15 — Administrative Matters — of authorization of legal acts for rural properties21.45 €
No. 15 — Administrative Matters — of construction prior to 1951121.02 €
No. 15 — Administrative Matters — InCI abatement — building and urbanization works56.75 €
No. 15 — Administrative Matters — of lot area rectification116.56 €
No. 15 — Administrative Matters — of right of first refusal47.18 €
No. 15 — Administrative Matters — of lotting licence40.82 €
No. 15 — Administrative Matters — for purposes of Municipal Property Tax59.32 €
No. 15 — Administrative Matters — location of Service Area on regional/national road network51.05 €
No. 15 — Administrative Matters — of municipal public/private domain149.80 €
No. 15 — Administrative Matters — of use of a fraction51.05 €
No. 15 — Administrative Matters — of co-ownership71.14 €
No. 15 — Administrative Matters — contractor data37.52 €
No. 15 — Administrative Matters — of property demolition121.02 €
No. 15 — Administrative Matters — of mortgage authorization for property located in subdivision37.52 €
No. 15 — Administrative Matters — licensing of earth-moving activity37.52 €
No. 15 — Administrative Matters — classification in the Municipal Master Plan of land/property59.32 €
No. 15 — Administrative Matters — prior communication37.52 €
No. 15 — Administrative Matters — absence of drawn plans for building works37.52 €
No. 15 — Administrative Matters — of crossing of properties by municipal roads37.52 €
No. 15 — Administrative Matters — aa) other certificates51.05 €
Request for cancellation of mortgage encumbrance81.08 €
No. 15 — Administrative Matters — Preparation fee — 80% of the applicable fee value64.86 €
Request for cancellation of indemnity encumbrance150.78 €
No. 15 — Administrative Matters — Preparation fee — 80% of the applicable fee value120.62 €
Request for cancellation of inalienability encumbrance81.08 €
No. 15 — Administrative Matters — Preparation fee — 80% of the applicable fee value64.86 €
Authentication of a written or drawn piece44.92 €
No. 15 — Administrative Matters — Preparation fee — 80% of the applicable fee value35.94 €
Authentication of Work's book24.02 €
No. 15 — Administrative Matters — Preparation fee — 80% of the applicable fee value19.22 €
2nd copy of works book24.02 €
No. 15 — Administrative Matters — Preparation fee — 80% of the applicable fee value19.22 €
Request for annotation, for each44.53 €
Right to information, under article 110 of the Legal Regime of Urbanization and Building48.63 €
Other
Other activities11.03 €

Regulamento de Taxas e Licenças Municipais

Verified

Official regulation

FeeAmount
Public Space Occupation
Venue License (up to 1 month)7.48 €
Venue License (2 to 3 months)12.47 €
Venue License (4 to 6 months)19.95 €
Venue License (7 to 12 months)27.43 €
Itinerant or Improvised Venue License (1st day)14.96 €
Itinerant or Improvised Venue License (1st day + following days)17.46 €
Economic Activities
7 - Grocery stores and delicatessens77.14 €
9 - Licences for other establishments subject to licensing143.99 €
Operating License - Grocery stores74.82 €
Operating License - other establishments139.66 €
Armorer's License8.98 €
Opening Hours
Operating Hours8.98 €
Noise
Special Noise Permit8.98 €
Inspections
Health Inspection20.86 €
Structural Inspection20.86 €

Tabela de Taxas pelo Depósito e Emissão de Segunda Via da Ficha Técnica de Habitação

Verified

Official regulation

FeeAmount
Documents & Certificates
Fee to be charged for deposit22.86 €

Compare these fees across municipalities →

Frequently asked questions

Are these fees up to date?

Each fee is verified from Seixal's official fee regulation, with its source year shown. Fees can change yearly — always confirm the final amount with the Câmara Municipal.

Where do these fees come from?

From Seixal's official Regulamento de Taxas (municipal fee regulation). Each table links back to the source document.

Are these all the fees?

These are the fees we have verified from the published regulation. Some services have case-specific fees — use the assistant or confirm with the Câmara.

How do I pay a municipal fee?

Payment is made to the Câmara Municipal de Seixal, usually at the counter or on the municipal portal; the exact channel depends on the service.

Is this an official source?

No — Foral Simplifica organises public municipal information to help you prepare. The competent authority is always the Câmara Municipal; confirm the final requirements and fees with them.

Seixal Municipal Fees: Verified Fee Table | Foral