Angra do Heroísmo
City Statistics
Population
35 402
Area
239 km²
District
Açores
NUTS II
Região Autónoma dos Açores
Category Breakdown
Performance across 6 scoring categories
People & Families
7.9 / 20
Economy & Jobs
9.5 / 20
Housing & Cost
6.3 / 20
Governance
9.5 / 20
Environment
5.4 / 20
News Radar
8.0 / 20
Top Scoring Drivers
Key indicators affecting this city's score
Annual Fire Count
0
Data from 2026
P100
Burned area (last year)
0 ha
Data from 2026
P100
Average Fire Duration
0 min
Data from 2026
P100
Fiscal Distress Signal
27
Data from 2026
P0
Urban Planning Decision Share
0.0%
Data from 2026
P0
Climate Comfort Days
15.6%
Data from 2025
P3
Recent News
Civic
Login to see civic cases for this municipality.
Governance Digest
PDM — map and rules
Land classes, constraints and building rules for the concelho.
View the PDMFor businesses and professionals tracking several municipalities
City Strategy
Knowledge-base coverage
What a Foral Terra report for this municipality can decide today, and what it withholds.
Coverage of this analysis: between 7% and 14%
- · Land applicability to be confirmed
- · Document available — needs validation
- · Document available — needs validation — Agricultural support
These open questions could change the conclusion.
See all (13)
- · Document available — needs validation — Agriculture
- · Document available — needs validation — Commerce
- · Document available — needs validation — Equipment
- · Document available — needs validation — Housing extension
- · Document available — needs validation — New housing
- · Document available — needs validation — Housing reconstruction
- · Document available — needs validation — Industry
- · Missing document — Rural tourism in an existing building
- · Missing document — Tourist housing in an existing building
- · Document available — needs validation — New hotel
See sources and details
No published framework has been confirmed for any of the 11 menu operations.
Next scheduled review: 2027-01-16. This is an internal review date, not a legal validity date: the law can change before it.
Per operation
- Agricultural support — Needs confirmation
- Agriculture — Needs confirmation
- Commerce — Needs confirmation
- Equipment — Needs confirmation
- Housing extension — Needs confirmation
- New housing — Needs confirmation
- Housing reconstruction — Needs confirmation
- Industry — Needs confirmation
- Rural tourism in an existing building — Withheld
- Tourist housing in an existing building — Withheld
- New hotel — Needs confirmation
This municipality's own plan text
Not part of the certified release — answers about this municipality's own plan are withheld rather than guessed.
Withheld operations
Rural tourism in an existing building, Tourist housing in an existing building
- · This release was assembled automatically and has not been reviewed by an operator.
- · The release cannot be cited for this municipality's own plan text.
- · The release does not contain the plan text currently served for this municipality (it is quarantined or awaiting re-certification), so it cannot be cited for it.