LIVE
Back

Barrancos

Beja
21 credits-19.2%
Foral Index: 38.5

City Statistics

Population

1702

Area

168.35 km²

District

Beja

NUTS II

Alentejo

Category Breakdown

Performance across 6 scoring categories

People & Families

6.3 / 20

Economy & Jobs

5.4 / 20

Housing & Cost

8.8 / 20

Governance

7.5 / 20

Environment

7.2 / 20

News Radar

3.5 / 20

Top Scoring Drivers

Key indicators affecting this city's score

Firefighters per 1000 inhabitants

PORDATA
Environment

23,1 /1000

Data from 2024

P100

Annual Fire Count

ICNF Wildfire Records (fogos.icnf.pt)
Environment

0

Data from 2026

P100

Burned area (last year)

ICNF Wildfire Records (fogos.icnf.pt)
Environment

0 ha

Data from 2026

P100

Cafes per 10k Residents

Foral Intelligence
Economy & Jobs

0 per 10k

Data from 2026

P0

Cafe Density (per km²)

Foral Intelligence
Economy & Jobs

0 per km²

Data from 2026

P0

Retail Amenity Density Index

Foral Intelligence
Economy & Jobs

0.00

Data from 2026

P0

Recent News

Civic

Login to see civic cases for this municipality.

Governance Digest

PDM — map and rules

Land classes, constraints and building rules for the concelho.

View the PDM

For businesses and professionals tracking several municipalities

City Strategy

Knowledge-base coverage

What a Foral Terra report for this municipality can decide today, and what it withholds.

Review mode: Automatic (no operator review)Release: r20

Coverage of this analysis: between 7% and 14%

Still to confirm:
  • · Land applicability to be confirmed
  • · Document available — needs validation
  • · Document available — needs validation — Agricultural support

These open questions could change the conclusion.

See all (13)
  • · Document available — needs validation — Agriculture
  • · Document available — needs validation — Commerce
  • · Missing document — Equipment
  • · Document available — needs validation — Housing extension
  • · Document available — needs validation — New housing
  • · Document available — needs validation — Housing reconstruction
  • · Document available — needs validation — Industry
  • · Missing document — Rural tourism in an existing building
  • · Missing document — Tourist housing in an existing building
  • · Document available — needs validation — New hotel
See sources and details

No published framework has been confirmed for any of the 11 menu operations.

Next scheduled review: 2027-01-16. This is an internal review date, not a legal validity date: the law can change before it.

Per operation

  • Agricultural support — Partial evidence
  • Agriculture — Partial evidence
  • Commerce — Needs confirmation
  • Equipment — Withheld
  • Housing extension — Needs confirmation
  • New housing — Partial evidence
  • Housing reconstruction — Needs confirmation
  • Industry — Needs confirmation
  • Rural tourism in an existing building — Withheld
  • Tourist housing in an existing building — Withheld
  • New hotel — Needs confirmation

This municipality's own plan text

2 document version(s) with 108 citable provisions.

Withheld operations

Equipment, Rural tourism in an existing building, Tourist housing in an existing building

  • · This release was assembled automatically and has not been reviewed by an operator.