LIVE
Back

Cadaval

Lisboa
21 credits+5.0%
Foral Index: 40.6

City Statistics

Population

14 185

Area

174.32 km²

District

Lisboa

NUTS II

Oeste e Vale do Tejo

Category Breakdown

Performance across 6 scoring categories

People & Families

6.4 / 20

Economy & Jobs

7.6 / 20

Housing & Cost

5.6 / 20

Governance

8.1 / 20

Environment

6.8 / 20

News Radar

6.1 / 20

Top Scoring Drivers

Key indicators affecting this city's score

Intentional Fire Percentage

ICNF Wildfire Records (fogos.icnf.pt)
Environment

0.0%

Data from 2026

P99

Business Support Decision Share

Foral Intelligence
Economy & Jobs

23.5%

Data from 2026

P98

Independent Media Negative Rate

Foral Intelligence
News Radar

0.0%

Data from 2026

P98

Public Works Pipeline (6m)

Foral Intelligence
Economy & Jobs

€47 947

Data from 2026

P0

Emergency Triage Wait

SNS Tempos - Emergency Wait Times
People & Families

15 min

Data from 2026

P2

Emergency Wait (Very Urgent Priority)

SNS Tempos - Emergency Wait Times
People & Families

27 min

Data from 2026

P2

Recent News

Civic

Login to see civic cases for this municipality.

Governance Digest

PDM — map and rules

Land classes, constraints and building rules for the concelho.

View the PDM

For businesses and professionals tracking several municipalities

City Strategy

Knowledge-base coverage

What a Foral Terra report for this municipality can decide today, and what it withholds.

Review mode: Automatic (no operator review)Release: r26

Coverage of this analysis: between 7% and 14%

Still to confirm:
  • · Land applicability to be confirmed
  • · Document available — needs validation
  • · Document available — needs validation — Agricultural support

These open questions could change the conclusion.

See all (13)
  • · Document available — needs validation — Agriculture
  • · Document available — needs validation — Commerce
  • · Document available — needs validation — Equipment
  • · Document available — needs validation — Housing extension
  • · Document available — needs validation — New housing
  • · Document available — needs validation — Housing reconstruction
  • · Document available — needs validation — Industry
  • · Missing document — Rural tourism in an existing building
  • · Missing document — Tourist housing in an existing building
  • · Document available — needs validation — New hotel
See sources and details

No published framework has been confirmed for any of the 11 menu operations.

Next scheduled review: 2027-01-16. This is an internal review date, not a legal validity date: the law can change before it.

Per operation

  • Agricultural support — Needs confirmation
  • Agriculture — Partial evidence
  • Commerce — Partial evidence
  • Equipment — Needs confirmation
  • Housing extension — Needs confirmation
  • New housing — Partial evidence
  • Housing reconstruction — Needs confirmation
  • Industry — Needs confirmation
  • Rural tourism in an existing building — Withheld
  • Tourist housing in an existing building — Withheld
  • New hotel — Partial evidence

This municipality's own plan text

1 document version(s) with 73 citable provisions.

Withheld operations

Rural tourism in an existing building, Tourist housing in an existing building

  • · This release was assembled automatically and has not been reviewed by an operator.