Góis
City Statistics
Population
4260
Area
263.3 km²
District
Coimbra
NUTS II
Centro
Category Breakdown
Performance across 6 scoring categories
People & Families
6.6 / 20
Economy & Jobs
6.9 / 20
Housing & Cost
9.2 / 20
Governance
8.1 / 20
Environment
7.5 / 20
News Radar
5.0 / 20
Top Scoring Drivers
Key indicators affecting this city's score
Sale Price per m2
€486/m²
Data from 2026
P99
Drunk Driving Reports
5
Data from 2025
P98
News Volume per 10K Residents
340.31
Data from 2026
P96
Banks and Savings Banks
0
Data from 2024
P0
Marriages
0
Data from 2025
P1
New Housing Buildings Completed
0
Data from 2025
P2
Recent News
Civic
Login to see civic cases for this municipality.
Governance Digest
PDM — map and rules
Land classes, constraints and building rules for the concelho.
View the PDMFor businesses and professionals tracking several municipalities
City Strategy
Knowledge-base coverage
What a Foral Terra report for this municipality can decide today, and what it withholds.
Coverage of this analysis: between 7% and 14%
- · Land applicability to be confirmed
- · Document available — needs validation
- · Document available — needs validation — Agricultural support
These open questions could change the conclusion.
See all (13)
- · Document available — needs validation — Agriculture
- · Document available — needs validation — Commerce
- · Document available — needs validation — Equipment
- · Document available — needs validation — Housing extension
- · Document available — needs validation — New housing
- · Document available — needs validation — Housing reconstruction
- · Document available — needs validation — Industry
- · Missing document — Rural tourism in an existing building
- · Missing document — Tourist housing in an existing building
- · Document available — needs validation — New hotel
See sources and details
No published framework has been confirmed for any of the 11 menu operations.
Next scheduled review: 2027-01-16. This is an internal review date, not a legal validity date: the law can change before it.
Per operation
- Agricultural support — Needs confirmation
- Agriculture — Needs confirmation
- Commerce — Partial evidence
- Equipment — Partial evidence
- Housing extension — Needs confirmation
- New housing — Needs confirmation
- Housing reconstruction — Needs confirmation
- Industry — Needs confirmation
- Rural tourism in an existing building — Withheld
- Tourist housing in an existing building — Withheld
- New hotel — Partial evidence
This municipality's own plan text
3 document version(s) with 326 citable provisions.
Withheld operations
Rural tourism in an existing building, Tourist housing in an existing building
- · This release was assembled automatically and has not been reviewed by an operator.